| Sno | Petition No Registration date |
Parties | Subject matter of the Petition | Procedeeing | Date Of Disposal/ Order |
Remark |
|---|---|---|---|---|---|---|
| 1 | 01/2020 01-01-2020 |
Suo Motu | Determination of generic preferential tariff for renewable energy sources based plants achieving CoD in FY 2019-20 and FY 2020-21 as per provisions specified in RE tariff Regulations, 2019 |
01-01-2020 See Proceeding |
Order Passed on16-01-2020 |
|
| 2 | 02/2020 02-01-2020 |
Chhattisgarh State Power Generation Company Limited | Petition for true-up of ARR of Conventional Thermal and Hydro Power Plant for FY 2017-18 and FY 2018-19 |
02-01-2020 See Proceeding |
Order Passed on30-05-2020 Revised Tariff Schedule30-05-2020 |
|
| 3 | 03/2020 02-01-2020 |
Chhattisgarh State Power Transmission Company Limited | Petition for approval of final true up ARR for FY 2017-18 and 2018-19 along with determination transmission tariff FY 2020-21. |
02-01-2020 See Proceeding |
Order Passed on30-05-2020 Revised Tariff Schedule30-05-2020 |
|
| 4 | 04/2020 02-01-2019 |
Chhattisgarh State Load Despatch Centre | Petition for approval of final true up ARR of FY 2017-18 and 2018-19. |
02-01-2019 See Proceeding |
Order Passed on30-05-2020 Revised Tariff Schedule30-05-2020 |
|
| 5 | 05/2020 03-01-2019 |
MS Rukmani Power Steel Pvt. Ltd. Vs 1. SLDC 2. CSPDCL |
Petition under section 89 (1) (f) read with section 33 (4) of the Electricity Act, 2003 for the payment of fixed chargescapacity charge for the period of Backing Down Instruction (BDI) followed by the petitioner and subjected to Merit Order Dispatch (MoD) principle. |
03-01-2019 See Proceeding |
Order passed on18-07-2022 |
. |
| 6 | 06/2020 03-01-2019 |
MS Shri Shyam Warehousing and Power Pvt. Ltd. Vs 1. SLDC 2. CSPDCL |
Petition under section 89 (1) (f) read with section 33 (4) of the Electricity Act, 2003 for the payment of fixed chargescapacity charge for the period of Backing Down Instruction (BDI) followed by the petitioner and subjected to Merit Order Dispatch (MoD) principle. |
03-01-2019 See Proceeding |
Order passed on18-07-2022 |
. |
| 7 | 07/2020 03-01-2019 |
MS R.R. Energy Ltd. Vs 1. SLDC 2. CSPDCL |
Petition under section 89 (1) (f) read with section 33 (4) of the Electricity Act, 2003 for the payment of fixed chargescapacity charge for the period of Backing Down Instruction (BDI) followed by the petitioner and subjected to Merit Order Dispatch (MoD) principle. |
03-01-2019 See Proceeding |
Order passed on18-07-2022 |
. |
| 8 | 08/2020 03-01-2020 |
MS Shanti GD Ispat Power Ltd. Vs 1. SLDC 2. CSPDCL |
Petition under section 89 (1) (f) read with section 33 (4) of the Electricity Act, 2003 for the payment of fixed chargescapacity charge for the period of Backing Down Instruction (BDI) followed by the petitioner and subjected to Merit Order Dispatch (MoD) principle. |
03-01-2020 See Proceeding |
Order passed on 18-07-2022 |
|
| 9 | 09/2020 03-01-2019 |
MS Mahavir Energy of Coal Benefication Ltd. Vs 1. SLDC 2. CSPDCL |
Petition under section 89 (1) (f) read with section 33 (4) of the Electricity Act, 2003 for the payment of fixed chargescapacity charge for the period of Backing Down Instruction (BDI) followed by the petitioner and subjected to Merit Order Dispatch (MoD) principle. |
03-01-2019 See Proceeding |
Order passed on18-07-2022 |
|
| 10 | 10/2020 03-01-2020 |
Chhattisgarh State Power Distribution Company Limited | Filling of petition under section 86 (1)(b) of the Electricity Act, 2003 for approval of power sale agreement between CSPDCL and M/s Solar Energy Corporation of India Ltd. (SECI) for purchase of 400 MW solar and wind combination (Hybrid) power on long-term basis discovered through competitive bidding process notified by Govt. of India. |
03-01-2020 See Proceeding |
Order Passed on24-04-2020 |
|
| 11 | 11/2020 04-01-2020 |
Suo Motu | Redressal of consumer grievances relaxation in the provision of the appropriate regulations. |
04-01-2020 See Proceeding |
Disposed off on 04.01.2020 | |
| 12 | 12/2020 09-01-2020 |
Suo MotuChhattisgarh State Power Distribution Company Limited | Determination of tariff for FY 2020-21. |
09-01-2020 See Proceeding |
Order Passed on30-05-2020 Revised Tariff Schedule30-05-2020 |
|
| 13 | 13/2020 09-01-2020 |
Suo Motu Vs Chhattisgarh State Power Distribution Company Limited |
Non-compliance of provision in the supply code for supply to multi consumer complex and housing colonies. |
09-01-2020 See Proceeding |
Disposed off on 07.08.2021 | |
| 14 | 14/2020 13-01-2020 |
Suo MotuChhattisgarh State Power Distribution Company Limited | Atal Jyoti Yojna. |
13-01-2020 See Proceeding |
Order Passed on03-03-2020 |
|
| 15 | 15/2020 16-01-2020 |
Chhattisgarh State Renewable Energy Development1. M/s Alok Ferro Alloys Ltd. 2. Chief Electrical Inspector | Miscellaneous petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 in the matter of non-compliance of CSERC (Renewable Purchase Obligation & REC Framework Implementation Regulation, 2016. For year 2018-19. |
16-01-2020 See Proceeding |
Order Passed on24-03-2021 |
|
| 16 | 16/2020 16-01-2020 |
Chhattisgarh State Renewable Energy Development1. M/s Hira Ferro Alloys Ltd. 2. Chief Electrical Inspector | Miscellaneous petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 in the matter of non-compliance of CSERC (Renewable Purchase Obligation & REC Framework Implementation Regulation, 2016. For year 2018-19. |
16-01-2020 See Proceeding |
Order passed on 24-03-2021 |
|
| 17 | 17/2020 16-01-2020 |
Chhattisgarh State Renewable Energy Development Vs 1. Ms Hira Power Steel Ltd. 2. Chief Electrical Inspector |
Miscellaneous petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 in the matter of non-compliance of CSERC (Renewable Purchase Obligation REC Framework Implementation Regulation, 2016. For year 2018-19. |
16-01-2020 See Proceeding |
Disposed off on 27.11.2021 | |
| 18 | 18/2020 16-01-2020 |
Chhattisgarh State Renewable Energy Development Vs Ms Jindal Steel Power Ltd. |
Miscellaneous petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 in the matter of non-compliance of CSERC (Renewable Purchase Obligation REC Framework Implementation Regulation, 2016. For year 2018-19. |
16-01-2020 See Proceeding |
Disposed off on 27.11.2021 | |
| 19 | 19/2020 16-01-2020 |
Chhattisgarh State Renewable Energy Development Vs Chhattisgarh State Power Distribution Company Limited |
Miscellaneous petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 in the matter of non-compliance of CSERC (Renewable Purchase Obligation REC Framework Implementation Regulation, 2016. For year 2018-19 |
16-01-2020 See Proceeding |
Disposed off on 27.11.2021 | |
| 20 | 20/2020 16-01-2020 |
Chhattisgarh State Renewable Energy Development Vs Ms Bhilai Steel Plant-Town Electrical Engineering Department (BSP-TEED) |
Miscellaneous petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 in the matter of non-compliance of CSERC (Renewable Purchase Obligation REC Framework Implementation Regulation, 2016. For year 2018-19. |
16-01-2020 See Proceeding |
Disposed off on 05.03.2020 | |
| 21 | 21/2020 16-01-2020 |
Chhattisgarh State Renewable Energy Development Vs Ms Chhattisgarh Distilleries Ltd. |
Miscellaneous petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 in the matter of non-compliance of CSERC (Renewable Purchase Obligation REC Framework Implementation Regulation, 2016. For year 2018-19. |
16-01-2020 See Proceeding |
Disposed off on 27.11.2021 | |
| 22 | 22/2020 16-01-2020 |
Chhattisgarh State Renewable Energy Development Vs Ms Madhya Bharat Paper Ltd. |
Miscellaneous petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 in the matter of non-compliance of CSERC (Renewable Purchase Obligation REC Framework Implementation Regulation, 2016. For year 2018-19. |
16-01-2020 See Proceeding |
Disposed off on 27.11.2021 | |
| 23 | 23/2020 16-01-2020 |
Chhattisgarh State Renewable Energy Development Vs 1. Ms Bharat Alluminium Company Ltd. 2. Chief Electrical Inspector |
Miscellaneous petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 in the matter of non-compliance of CSERC (Renewable Purchase Obligation REC Framework Implementation Regulation, 2016. For year 2018-19. |
16-01-2020 See Proceeding |
Disposed off on 27.11.2021 | |
| 24 | 24/2020 16-01-2020 |
Chhattisgarh State Renewable Energy Development Vs Ms Ambuja Cements Ltd. |
Miscellaneous petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 in the matter of non-compliance of CSERC (Renewable Purchase Obligation REC Framework Implementation Regulation, 2016. For year 2018-19. |
16-01-2020 See Proceeding |
Disposed off on 27.11.2021 | |
| 25 | 25/2020 16-01-2020 |
Chhattisgarh State Renewable Energy Development Vs 1. Ms Indsil Energy and Electrochemicals Ltd. 2. Chief Electrical Inspector |
Miscellaneous petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 in the matter of non-compliance of CSERC (Renewable Purchase Obligation REC Framework Implementation Regulation, 2016. For year 2018-19 |
16-01-2020 See Proceeding |
Disposed off on 05.03.2020 | |
| 26 | 26/2020 16-01-2020 |
Chhattisgarh State Power Distribution Company LimitedM/s NMDC Iron & Steel Plant | Petition under section 94 (1)(f) of the Electricity Act, 2003 read with order 47 Rule 1 of the Code of Civil Procedure 1908 and clause 23 of CSERC (Conduct of Business) Regulations, 2009 |
16-01-2020 See Proceeding |
Order passed on 16-10-2020 |
|
| 27 | 27/2020 25-01-2020 |
Ms Mangal Sponge and Steel Private Limited Vs Chhattisgarh State Power Transmission Company Limited Others |
Petition under section 86 (1)(f) of the Electricity Act, 2003 for refund of amount of Rs. 2,36,000- towards processing fees. |
25-01-2020 See Proceeding |
Order Passed on30-03-2021 |
|
| 28 | 28/2020 27-01-2020 |
Ms Godawari Power Ispat Limited Vs Chhattisgarh State Power Distribution Company Limited |
Petition for removal of difficulties under Regulation 29 of the CSERC (Grid Interactive Distributed Renewable energy Sources) Regulations, 2019 and for providing relaxation under Regulation 27 rw Regulation 26 of the CSERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2019. |
27-01-2020 See Proceeding |
Order Passed on10-03-2021 |
|
| 29 | 29/2020 31-01-2020 |
स्वप्रेरित
श्री नुकमदास साहू
Vs कार्यपालन यंत्री (संचासंधा.) छ.रा.वि.वित. मर्या. बालोद |
विद्युत लोकपाल, रायपुर के प्रकरण क्रमांक 062018 के परिपालन आदेष दिनांक 07082018 के संबंध में राषि वापसी दिलाने बाबत्। |
31-01-2020 See Proceeding |
Disposed off on 01.03.2021 | |
| 30 | 30/2020 03-02-2020 |
M/s Lanco Amarkantak Power Limited1. Chhattisgarh State Power Trading Company Limited 2. Chhattisgarh State Power Distribution Company Limited | Petition under section 94 (1) (f) of the Electricity Act, 2003 read with Order 47 Rule 1 of Civil procedure 1908 and clause 23 of CSERC (Conduct of Business) Regulations, 2009. |
03-02-2020 See Proceeding |
Order passed in order sheet dated 25-03-2021 |
|
| 31 | 31/2020 03-02-2020 |
M/s Lanco Amarkantak Power Limited Vs 1. Chhattisgarh State Power Trading Company Limited 2. Chhattisgarh State Power Distribution Company Limited |
Petition under section 86 (1)(a) read with section 62 of the Electricity Act, 2003, for determination of tariff (Energy Charges) and truing up of five percent (5%) power supplied to Chhattisgarh State Power Trading Company Limited for the period FY 2018-19 to 2019-20. |
03-02-2020 See Proceeding |
Order passed on 28-10-2022 |
Appeal before Tribunal. |
| 32 | 32/2020 03-02-2020 |
M/s DB Power Limited1. Chhattisgarh State Power Trading Company Limited 2. Chhattisgarh State Power Distribution Company Limited | Petition under section 86 of the Electricity Act, 2003 for truing up of energy (variable) charges, approval of other reimbursable expenses for FY 2018-19 and approval of provisional energy charges and other reimbursable expenses for FY 2020-21. |
03-02-2020 See Proceeding |
Order passed on 31-03-2021 |
|
| 33 | 33/2020 06-02-2020 |
Ms Jindal Steel and Power Limited (D) | Petition for determination of Annual Revenue Requirement and retail tariff for FY 2019-20, revised estimated for 2018-19 along with true up of FY 2017-18 for petitioner’s Distribution Licensee Business. |
06-02-2020 See Proceeding |
Order passed on 28-11-2022 |
Appeal before Tribunal. |
| 34 | 34/2020 06-02-2020 |
M/s Jindal Steel and Power Limited (T) | Petition for determination of transmission tariff for FY 2019-20 along with revised estimate for FY 2018-19 and true up of the year FY 2017-18. |
06-02-2020 See Proceeding |
Order passed on 23-08-2022 |
|
| 35 | 35/2020 07-02-2020 |
Chhattisgarh State Power Trading Company Limited1. M/s Lanco Amarkantak Power Limited 2. Chhattisgarh State Power Distribution Company Limited | Review application arising out of order dated 01.01.2020 in Petition No. 41 of 2017(T) |
07-02-2020 See Proceeding |
Order passed in order sheet dated 25-03-2021 |
|
| 36 | 36/2020 07-02-2020 |
Chhattisgarh State Power Trading Company Limited1. D.B. Power Limited 2. Chhattisgarh State Power Distribution Company Limited | Review application arising out of order dated 01.01.2020 in Petition No. 43 of 2017 (T). |
07-02-2020 See Proceeding |
Withdrawn on 14.02.2020 | |
| 37 | 37/2020 25-02-2020 |
श्री विजय खण्डेलवाल, राजनांदगाॅव
Vs मुख्य अभियंता छत्तीसगढ् राज्य विद्युत वितरण कंपनी मर्यादित राजनांदगाॅव व दो अन्य |
याचिका विद्युत अधिनियम की धारा 142 के अंतर्गत एवं विद्युत लोकपाल के प्रकरण क्रमांक 102019 में पारित आदेश दिनांक 06.12.2019 का अनुपालन के संबंध में। |
25-02-2020 See Proceeding |
Disposed off on 28.08.2020 | |
| 38 | 38/2020 11-03-2020 |
M/s Solbridge Energy Private LimitedCSPDCL & 3 Others | Petition under section 86 (1) (e), section 61 (h) and section 66 of the Electricity Act, 2003 read with Regulation 44, 45 & 50 of the CSERC (Conduct of Business) Regulation, 2009 and Regulation 26 of CSERC (Grid Interactive Distributed Renewable Energy Sources) Regulation, 2019 seeking standard wheeling nd banking agreements. |
11-03-2020 See Proceeding |
Order passed on 06-07-2020 |
|
| 39 | 39/2020 18-03-2020 |
Suo Motu | Approval for supply of addl. 100 KVA (over & above existing 500 KVA) HT power supply on 11 KV in resect of M/s Aditya Engineering Company, Metal Park Phase-I, Rawabhata, Raipur B.P. No. 102530 |
18-03-2020 See Proceeding |
Order passed on 20-05-2020 |
|
| 40 | 40/2020 21-04-2020 |
Suo Motu | Directions to mitigate the impact of COVID-19 on Generating Companies and Licensees in the State of Chhattisgarh |
21-04-2020 See Proceeding |
Order Passed on21-04-2020 |
|
| 41 | 41/2020 21-04-2020 |
Ms Jindal Steel Power Limited Vs CREDA |
Petition under section 86 (1) (e) of the Electricity Act, 2020 for issuance of appropriate directions for the purpose of fulfillment o Renewable Purchase Obligation (RPO). |
21-04-2020 See Proceeding |
Order Passed on28-10-2020 |
|
| 42 | 42/2020 21-04-2020 |
M/s Bhilai Steel Plant - TEED | Final true-up petition for FY 2016-17 & 2017-18 and determination of of retail power supply tariff for FY 2019-20. |
21-04-2020 See Proceeding |
Order passed on 23-08-2022 |
|
| 43 | 43/2020 24-04-2020 |
M/s Hira Ferro Alloys Limited & Chhattisgarh Ferro Alloys Produce AssociationChhattisgarh State Power Distribution Company Limited | Petition under section 86 (1) (i) (f) of the Electricity Act, 2003 read with section 33 of the CSERC (Conduct of Business) Regulations, 2009. |
24-04-2020 See Proceeding |
Order Passed on15-05-2020 |
|
| 44 | 44/2020 24-04-2020 |
Suo Motu
Ms South East Central Railway Vs CSPTCL, SLDC and CSPDCL |
Power procurement by Indian Railways through open access in the State of Chhattisgarh as a deemed licensee. |
24-04-2020 See Proceeding |
Order passed on 24-02-2022 |
|
| 45 | 45/2020 25-04-2020 |
M/s Chhattisgarh Mini Steel Plant AssociationChhattisgarh State Power Distribution Company Limited | Petition for revision in bill of march, 2020 and relaxation in last date of payment ad against non-compliance various provisions of supply code. |
25-04-2020 See Proceeding |
Order Passed on15-05-2020 |
|
| 46 | 46/2020 01-05-2020 |
Suo Motu Chhattisgarh State Power Distribution Company Limited | To relax supply code provisions - under condition of COVID-19. |
01-05-2020 See Proceeding |
Order Passed on01-05-2020 |
|
| 47 | 47/2020 06-05-2020 |
Suo Motu | Directions to mitigate the impact of COVID-19 on Consumers in the State of Chhattisgarh |
06-05-2020 See Proceeding |
Order Passed on06-05-2020 |
|
| 48 | 48/2020 13-05-2020 |
Suo Motu | Request of Chhattisgarh State Power Distribution Company Ltd for permission for tap connection to M/s Rama Udyog Pvt. Limited |
13-05-2020 See Proceeding |
Order Passed on18-05-2020 |
|
| 49 | 49/2020 20-05-2020 |
Chhattisgarh State Power Distribution Limited Vs Ms Solar Energy Corporation of India Ltd. (SECI) |
Petition under section 86(1) of the Electricity Act, 2003 for approval of procurement of power from 100 MW (AC) solar power with 50 MW150MWh Energy from Battery storage on long term basis from SECI and PPA dated 13.02.2020 executed between SECI and CSPDCL. |
20-05-2020 See Proceeding |
Disposed off on 26.06.2020 |