| Sno | Petition No Registration date |
Parties | Subject | Procceding | Date Of Disposal/ Order |
Remark |
|---|---|---|---|---|---|---|
| 1 | 01/2026 02-01-2026 |
Chhattisgarh State Power Generation Company Limited | Petition for Determination of ARR/ Tariff of CSPGCL’s Small/ Mini Hydro Plants For FY 2026-27 TO FY 29-30 Read More | See Proceeding |
Order Passed on 25-03-2026 |
|
| 2 | 02/2026 02-01-2026 |
Chhattisgarh State Power Generation Company Limited | Petition for Approval of Capital Investment Plan For FY 2026-27 to FY 2029-30 Read More | See Proceeding |
Order passed on 17-04-2026 |
|
| 3 | 03/2026 02-01-2026 |
Adit Ispaat Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Transmission Company Limited |
In the matter of seeking exemption from having dedicated feeder for availing open access for solar pv power at user end under provisions of Clause 5(5) of CSERC (Connectivity and Intra-state Open Access) Regulations 2011 as amended by CSERC (Connectivity and Intra-state Open Access) (1st Amendment) Regulations 2012 Read More | See Proceeding |
Order Passed 26-02-2026 |
Hearing on |
| 4 | 04/2026 06-01-2026 |
Bharat Aluminium Company Limited Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Superintending Engineer Circle |
Review Petition under S. 94 of Electricity Act Read More | See Proceeding | ||
| 5 | 05/2026 13-01-2026 |
Chhattisgarh State Power Transmission Company Limited | Submission of Tariff Petition in respect of CSPTCL for approval of “Final True up of Annual Revenue Requirement of FY 2024-25 along with proposal of ARR of each year of upcoming control period FY 2026-27 to FY 2029-30 determination of transmission Tariff for FY 2026-27” before Hon’ble CSERC”. Read More | See Proceeding |
Order passed on 15-06-2026 Corrigendum order passed on 19-06-2026 |
|
| 6 | 06/2026 13-01-2026 |
Chhattisgarh State Power Transmission Company Limited | Submission of Petition for the approval of Capital Investment Plan for FY 27 to FY 30 in respect of CSPTCL. Read More | See Proceeding |
order passed on 17-04-2026 |
|
| 7 | 07/2026 13-01-2026 |
CHHATTISGARH STATE LOAD DESPATCH CENTRE | CAPITAL INVESTMENT PLAN FY26-30 Read More | See Proceeding |
Order passed on 16-04-2026 |
|
| 8 | 08/2026 13-01-2026 |
CHHATTISGARH STATE LOAD DESPATCH CENTRE | Capital Investment Plan (CIP) And ARR for the control period from FY 2026-2030 along with True up of FY 2024-25 in respect of SLDC Read More | See Proceeding |
Order passed on 15-06-2026 |
|
| 9 | 09/2026 13-01-2026 |
Suo Motu Respondent 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd 4. Real Ispat and Power Ltd 5. GRAVITY FERROUS PRIVATE LIMITED 6. JINDAL STEEL AND POWER LIMITED 7. Mahendra Sponge Power Ltd 8. Ultratech Cement Ltd Unit Baikunth Cement Works 9. SHRI BAJRANG POWER AND ISPAT LTD |
Resolution of difficulties in excise of clause 14 of Order dated 23.12.2025 issued petitoin No. 51 of 2025. Read More | See Proceeding |
Draft Order 23-01-2026 Order Passed. 29-05-2026 |
|
| 10 | 10/2026 14-01-2026 |
Ms Fortune Metaliks Limited Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Transmission Company Limited |
Petition seeking exemption from having dedicated feeder for availing open access under provisions of Clause 5(5) of CSERC (Connectivity and inter-state Open Access) Regulation, 2011 and amendment Regulations,2012 and under section 86(1)(e) of the Electricity Act, 2003. Read More | See Proceeding |
Order passed on 27-04-2026 |
|
| 11 | 11/2026 16-01-2026 |
SHRI BAJRANG POWER AND ISPAT LTD Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Transmission Company Limited |
Miscellaneous petition seeking an exemption from having dedicated feeder to avail open access for M/s Shri Bajrang Power Ispat Ltd (Iron Ore Mines) (B.P No. 1021471), CD – 530 KVA having its connectivity at 33 KV supply voltage (Through Tapped Feeder) from Puttarwahi 132/33 KV S/s to 33 KV S/s Durgkondal Feeder under Clause 5(5) of CSERC (connectivity and Intra-State Open Access) Regulations, 2011 and amendment Regulations, 2012. Read More | See Proceeding |
Order passed on 11-05-2026 |
|
| 12 | 12/2026 21-01-2026 |
JINDAL STEEL AND POWER LIMITED | Petition under Section 62(4) read with Section 86 of the Electricity Act, 2003 for seeking amendment of the Tariff Order dated 23.07.2025, passed by this Hon’ble Commission in Petition No. 02 of 2025, which was filed by the Petitioner for seeking Truing up for FY 2023-24 and determination of ARR and Retail Tariff for FY 2025-26 for the licensed distribution business. Read More | See Proceeding |
Disposed off. 14-07-2026 |
|
| 13 | 13/2026 21-01-2026 |
JINDAL STEEL AND POWER LIMITED | REVIEW PETITION UNDER SECTION 94(1)(f) OF THE ELECTRICITY ACT, 2003 READ WITH REGULATION 23 OF THE CHHATTISGARH STATE ELECTRICITY REGULATORY COMMISSION (CONDUCT OF BUSINESS) REGULATIONS, 2009 AND REGULATION 33 OF THE CHHATTISGARH STATE ELECTRICITY REGULATORY COMMISSION (DETAILS TO BE FURNISHED BY LICENSEE OR GENERATING COMPANY FOR DETERMINATION OF TARIFF AND MANNER OF MAKING APPLICATION) REGULATIONS, 2004 FOR SEEKING REVIEW OF THE ORDER DATED 23.07.2025 PASSED IN PETITION NO. 02 OF 2025 FOR THE LICENSED DISTRIBUTIION BUSINESS. Read More | See Proceeding | ||
| 14 | 14/2026 27-01-2026 |
Sponge Enterprises Private Limited Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Transmission Company Limited |
Petition seeking exemption from having dedicated feeder under clause 4.2.3 of CG Grid code for availing grid connectivity to co-located captive solar power plant through shared 33 KV feeder without availing open access under section 86 (1) (e) of the Electricity Act, 2003. Read More | See Proceeding |
Order passed. 06-05-2026 |
|
| 15 | 15/2026 27-01-2026 |
Sponge Enterprises Private Limited Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Transmission Company Limited |
Petition seeking exemption from having dedicated feeder under clause 4.2.3 of CG Grid code for availing grid connectivity to co-located captive solar power plant through shared 33 KV feeder without availing open access under section 86 (1) (e) of the Electricity Act, 2003. Read More | See Proceeding |
Order passed. 06-05-2026 |
|
| 16 | 16/2026 27-01-2026 |
Iskcon Strips Private Limited Vs 1. Chhattisgarh State Power Transmission Company Limited 2. Chhattisgarh State Power Distribution Co Ltd |
Seeking Exemption from having dedicated feeder for availing open access for solar pv power at user end under Clause 5(5) of CSERC ( Connectivity Intra-state open Access Regulation 2011. Read More | See Proceeding |
The case is disposed of. 06-05-2026 |
|
| 17 | 17/2026 27-01-2026 |
JINDAL STEEL AND POWER LIMITED | Petition for determination of Annual Revenue Requirement for FY 2026-27 to FY 2029-30 along with Revised Estimate for FY 2025-26 and True-Up for FY 2024-25 for the licensed transmission business under Section 61, 62 and 86 (1) (a) of the Electricity Act, 2003 together with the relevant provisions of the Chhattisgarh State Electricity Regulatory Commission’s Conduct of Business Regulations and Terms and Conditions for determination of Tariff Regulations and its amendments thereof. Read More | See Proceeding | ||
| 18 | 18/2026 27-01-2026 |
JINDAL STEEL AND POWER LIMITED | Petition for determination of Annual Revenue Requirement and Retail Supply Tariff for FY 2026-27 to FY 2029-30 along with Revised Estimate for FY 2025-26 and True-Up for FY 2024-25 for the licensed distribution business under Section 61, 62 and 86 (1) (a) of the Electricity Act, 2003 read with the relevant provisions of the Chhattisgarh State Electricity Regulatory Commission’s Conduct of Business Regulations and Terms and Conditions for determination of Tariff Regulations and its amendments thereof. Read More | See Proceeding | ||
| 19 | 19/2026 29-01-2026 |
Ms Maa Kudargarhi Power and Ispat Pvt Ltd Vs 1. Chhattisgarh State Power Transmission Company Limited 2. Chhattisgarh State Power Distribution Co Ltd |
Application seeking exemption from having a dedicated feeder at captive user end for drawl of power from a differently located Captive WHRB Power Plant situated at M/s Shri Baba Baidnath Ispat Pvt. Ltd., having 10 MW (AC) capacity. Read More | See Proceeding |
Order passed on 13-04-2026 |
|
| 20 | 20/2026 29-01-2026 |
Shivalik Engineering Industries Limited Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Transmission Company Limited |
Petition seeking exemption from having dedicated feeder for availing open access for Solar PV power at user end under provisions of Clause 5(5) of CSERC (Connectivity and inter-state Open Access) Regulation 2011 as amended by CSERC (Connectivity and intra-state Open Access) (First Amendment) Regulation 2012. Read More | See Proceeding |
Order Passed . 11-03-2026 |
|
| 21 | 21/2026 29-01-2026 |
South East Central Railway Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
PETITION UDER THE ELECTRICITY ACT 2003 READ WITH APPLICABLE CERC/CSERC REGULATIONS SEEKING RECOGNITION OF ONE FRAGMENTED CONTROL AREA OF ALL TRACTION SUB STATION Read More | See Proceeding | ||
| 22 | 22/2026 29-01-2026 |
Ultratech Cement Limited Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Transmission Company Limited |
Petition under Sections 42 to 46 and 86 of the Electricity Act 2003 for seeking clarification regarding maintaining Contract Demand in the facts of the Petitioners case Read More | See Proceeding | ||
| 23 | 23/2026 29-01-2026 |
Ultratech Cement Limited Vs 1. Chhattisgarh State Power Transmission Company Limited 2. Chhattisgarh State Power Distribution Co Ltd |
Petition under Sections 50 and 86 (1)(c),(e),(h) and (k) of the Electricity Act, 2003 read with the Chhattisgarh State Electricity Supply Code, 2011 (as amended) and the Chhattisgarh State Electricity Grid Code, 2011, seeking approval of this Hon’ble Commission for enhancement of power drawal load up to 80 MW through existing dedicated transmission line connection qua UTCL’s Rawan Cement Plant connected through the dedicated 132 kV Suhela-Rawan transmission line from CSPTCL’s 220/132 kV Suhela Sub-station. Read More | See Proceeding | ||
| 24 | 24/2026 29-01-2026 |
Elevar Digitel Infrastructure Pvt Ltd Vs 1. Chhattisgarh State Power Distribution Co Ltd |
For transfer of electricity connections into the name of M/s Elevar Digitel Infrastructure Pvt. Ltd. Read More | See Proceeding | ||
| 25 | 25/2026 06-02-2026 |
Ms VIHAAN INDUSTRIES Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Transmission Company Limited |
In the matter of seeking exemption from having dedicated feeder for availing open access for Solar PV power at user end under provisions of Clause 5(5) of CSERC (Connectivity and Intra-state Open Access) Regulations 2011 as amended by CSERC (Connectivity and Intra-state Open Access) (First Amendment) Regulations 2012. Read More | See Proceeding |
Order Passed. 11-03-2026 |
|
| 26 | 26/2026 06-02-2026 |
Shree Hanuman Loha Private Limited Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Transmission Company Limited |
APPLICATION SEEKING EXEMPTION FROM HAVING DEDICATED FEEDER FOR AVAILING OPEN ACCESS FOR WHRB POWER AT USER END UNDER PROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 86(1)(e) OF ELECTRICITY ACT 2003 Read More | See Proceeding |
Order Passed on 13-04-2026 |
|
| 27 | 27/2026 06-02-2026 |
Suo Motu Respondent 1. Town Electrical Engg Department Bhilai Steel Plant |
Proposal for initiating suo-moto proceeeding for determination of approval of retail tariff of FY 2026-27 in respect of BSP-TEED. Read More | See Proceeding | ||
| 28 | 28/2026 10-02-2026 |
Suo Motu Respondent 1. Shashank Dubey |
Complaint of Mr. Shashank Dubey against Vedanta Group of Companies. Read More | See Proceeding | ||
| 29 | 29/2026 12-02-2026 |
Goyal Industries Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Transmission Company Limited |
In the matter of seeking exemption from having dedicated feeder fr availing open access for solar pv power at user end under provisions of Clause 5(5) of CSERC (Connectivity and Intrastate Open Access) Regulations 2011 as amended by CSERC (Connectivity and Intrastate Open Access) (First Amendment) Regulations 2012 Read More | See Proceeding |
The case is disposed. 20-04-2026 |
|
| 30 | 30/2026 12-02-2026 |
Hotel Amit Park International Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Transmission Company Limited |
In the matter of exemption from having open access through dedicated feeder under the provisions of clause 5(5) of CSERC (Connectivity and Intrastate Open Access) Regulations 2011 as amended by CSERC (Connectivity and Intrastate Open Access) (First Amendment) Regulations 2012 Read More | See Proceeding |
The case is disposed. 20-04-2026 |
|
| 31 | 31/2026 12-02-2026 |
Fortune Metaliks Ltd Vs 1. Chhattisgarh State Power Distribution Co Ltd |
In the matter to issue direction to make supply of electricity through Prepayment Energy Meter Read More | See Proceeding | ||
| 32 | 32/2026 17-02-2026 |
ACB INDIA LTD TPP Village Renki PO Chainpur Teh Pa Vs 1. Chhattisgarh State Power Distribution Co Ltd |
Petition for Truing Up of Energy (Variable) Charges as well as for approval of other reimbursable expenses for the period FY 2024-25, in terms of Section 62, 86(1)(a) and other applicable provisions of the Electricity Act, 2003 in respect of 5% of the contracted capacity procured by the Respondent from 1x63 MW Coal Washery Reject based Thermal Power Plant of M/s ACB India Ltd., Vill. Renki of Chainpur Tehsil Hardi Bazar in Korba District, Chhattisgarh to CSPTrdCL as per the terms of Power Purchase Agreement dated 21.01.2016 read with Supplemental Agreement dated 17.09.2019 and Secondary Amendment dated 25.03.2021. Read More | See Proceeding | ||
| 33 | 33/2026 17-02-2026 |
ACB INDIA LTD TPP Village Renki PO Chainpur Teh Pa Vs 1. Chhattisgarh State Power Distribution Co Ltd |
Petition for Truing Up of Energy (Variable) Charges as well as for approval of other reimbursable expenses for FY 2024-25, in terms of Section 62, 86(1)(a) and other applicable provisions of the Electricity Act, 2003 in respect of 5% of the contracted capacity procured by the Respondent from 2x50 MW Coal Washery Reject based Thermal Power Plant of M/s ACB India Ltd., Vill. Ratija of Tehsil Pali, Korba district, Chhattisgarh to CSPTrdCL as per the terms of Power Purchase Agreement for Unit I dated 05.12.2013 read with Amendment dated 25.03.2021 and Supplemental Agreements dated 26.02.2015, 17.09.2019, and Power Purchase Agreement for Unit II dated 10.09.2018. Read More | See Proceeding | ||
| 34 | 34/2026 17-02-2026 |
ACB India Private Limited Vs 1. Chhattisgarh State Power Distribution Co Ltd |
Petition for Truing Up of Energy (Variable) Charges as well as for approval of other reimbursable expenses for the period FY 2024-25, in terms of Section 62, 86(1)(a) and other applicable provisions of the Electricity Act, 2003 in respect of 5% of the contracted capacity procured by the Respondent from 2x135 MW Coal Washery Reject based Thermal Power Plant of M/s ACB India Ltd., Vill. Kasaipalli of Tehsil Khatgora in Korba District, Chhattisgarh to CSPTrdCL as per the terms of Power Purchase Agreement dated 5.12.2013 read with Addendum dated 26.2.2015 and Supplemental Agreement dated 4.11.2020. Read More | See Proceeding | ||
| 35 | 35/2026 17-02-2026 |
ACB India Private Limited Vs 1. Chhattisgarh State Power Distribution Co Ltd |
Petition for Truing Up of Energy (Variable) Charges as well as for approval of other reimbursable expenses for the period FY 2024-25, in terms of Section 62, 86(1)(a) and other applicable provisions of the Electricity Act, 2003 in respect of 5% of the contracted capacity procured by the Respondent from Unit II of 2x30 MW Coal Washery Reject based Thermal Power Plant of M/s ACB India Ltd., Vill. Chakabura of Tehsil Khatgora in Korba District, Chhattisgarh to CSPTrdCL (now CSPDCL) as per the terms of Power Purchase Agreement dated 15.1.2015 read with Supplemental Agreement dated 17.09.2019. Read More | See Proceeding | ||
| 36 | 36/2026 27-02-2026 |
Suo Motu Respondent 1. Chhattisgarh State Power Distribution Co Ltd |
Grievances of consumer related to automatic disconnection. Read More | See Proceeding |
Order Passed. 22-04-2026 |
|
| 37 | 37/2026 02-03-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. Chhattisgarh Hydro Power LLP |
Petition under Section 62 read with Section 86 (1) (b) of the Electricity Act, 2003 for approval of deviations in the Power Purchase Agreement dated 18/11/2025 executed by and between CSPDCL AND M/s Chhattisgarh Hydro Power LLP FROM the Draft Power Purchase Agreement approved by the Commission vide Petition No.25/2016 dated 09/02/2017. AND further approval of the Power Purchase Agreement dated 18/11/2025 executed by and between CSPDCL AND M/s Chhattisgarh Hydro Power LLP and long term procurement of 3x8.3 MW (24.90) MW of Hydro Power for a period of 40 years Read More | See Proceeding |
Order Passed. 19-06-2026 |
|
| 38 | 38/2026 06-03-2026 |
Chhattisgarh State Power Distribution Co Ltd | छ.स्टे.पाॅ.डि.कं.लि. द्वारा बकाया राशि की वसूली हेतु प्रस्तुत ‘‘समाधान योजना 2026’’ के अनुमोदन हेतु। Read More | See Proceeding | ||
| 39 | 39/2026 09-03-2026 |
JSW Mahanadi Power Company Limited. Vs 1. Chhattisgarh State Power Distribution Co Ltd |
Petition for Truing Up of Energy (Variable) Charges and Approval of Other Reimbursable Expenses for the Power Supplied by the Petitioner to the Respondent from FY 2017-18 (March 2018) to FY 2024-25, and for Approval of Methodology for Determination of Tariff and Other Reimbursable Expenses for the Subsequent Period, in terms of Sections 62, 64(5), 86(1)(b) and other applicable provisions of the Electricity Act, 2003 read with the Tariff Policy, in respect of 5% of the Net Generated Power Procured by the Respondent under the Power Purchase Agreement dated 18.10.2013 Read More | See Proceeding | ||
| 40 | 40/2026 09-03-2026 |
Ms AGRAWAL SPONGE PRIVATE LIMITED Vs 1. Chhattisgarh State Power Transmission Company Limited 2. Chhattisgarh State Power Distribution Co Ltd |
अभ्यावेदन वर्ष 2024 - 25 के अंत में 31/03/2025 को अप्रयुक्त/ अतिरिक्त जमा उर्जा (बैंकिग एनर्जी) के संबंध में छत्तीसगढ़ विद्युत नियामक आयोग (ग्रीड इन्टरक्टिव वितरित नवीनीकरण उर्जा स्रोत) विनियम 2021 के कंडिका 21.7 में छुट तथा विद्युत अधिनियम 2003 की धारा 86(1)(F) के तहत छुट और DRE (Distributed Renewable Energy) Regulations 2019 की कंडिका 29 के अंतर्गत आदेश क्रमांक 35 ऑफ 2024 के अंतर्गत प्रस्तुत। Read More | See Proceeding |
Order Passed. 03-07-2026 |
|
| 41 | 41/2026 09-03-2026 |
Viraansh Industries Private Limited Vs 1. Chhattisgarh State Power Transmission Company Limited 2. Chhattisgarh State Power Distribution Co Ltd |
अभ्यावेदन वर्ष 2024 - 25 के अंत में 31/03/2025 को अप्रयुक्त/ अतिरिक्त जमा उर्जा (बैंकिग एनर्जी) के संबंध में छत्तीसगढ़ विद्युत नियामक आयोग (ग्रीड इन्टरक्टिव वितरित नवीनीकरण उर्जा स्रोत) विनियम 2021 के कंडिका 21.7 में छुट तथा विद्युत अधिनियम 2003 की धारा 86(1)(F) के तहत छुट और DRE (Distributed Renewable Energy) Regulations 2019 की कंडिका 29 के अंतर्गत आदेश क्रमांक 35 ऑफ 2024 के अंतर्गत प्रस्तुत। Read More | See Proceeding |
Order Passed. 03-07-2026 Corrigendum Order. 14-07-2026 |
|
| 42 | 42/2026 09-03-2026 |
Jayshree Grain Processing Private Limited Vs 1. Chhattisgarh State Power Transmission Company Limited 2. Chhattisgarh State Power Distribution Co Ltd |
अभ्यावेदन वर्ष 2024 - 25 के अंत में 31/03/2025 को अप्रयुक्त/ अतिरिक्त जमा उर्जा (बैंकिग एनर्जी) के संबंध में छत्तीसगढ़ विद्युत नियामक आयोग (ग्रीड इन्टरक्टिव वितरित नवीनीकरण उर्जा स्रोत) विनियम 2021 के कंडिका 21.7 में छुट तथा विद्युत अधिनियम 2003 की धारा 86(1)(F) के तहत छुट और DRE (Distributed Renewable Energy) Regulations 2019 की कंडिका 29 के अंतर्गत आदेश क्रमांक 35 ऑफ 2024 के अंतर्गत प्रस्तुत। Read More | See Proceeding |
Order Passed. 03-07-2026 Corrigendum Order. 14-07-2026 |
|
| 43 | 43/2026 09-03-2026 |
RDB GREEN ENERGY PRIVATE LIMITED Vs 1. Chhattisgarh State Power Transmission Company Limited 2. Chhattisgarh State Power Distribution Co Ltd |
अभ्यावेदन वर्ष 2024 - 25 के अंत में 31/03/2023 को अप्रयुक्त/ अतिरिक्त जमा उर्जा (बैंकिग एनर्जी) के संबंध में छत्तीसगढ़ विद्युत नियामक आयोग (ग्रीड इन्टरक्टिव वितरित नवीनीकरण उर्जा स्रोत) विनियम 2021 के कंडिका 21.7 में छुट तथा विद्युत अधिनियम 2003 की धारा 86(1)(F) के तहत छुट और DRE (Distributed Renewable Energy) Regulations 2019 की कंडिका 29 के अंतर्गत आदेश क्रमांक 35 ऑफ 2024 के अंतर्गत प्रस्तुत। Read More | See Proceeding |
Order Passed. 29-07-2026 |
|
| 44 | 44/2026 09-03-2026 |
VASWANI INDUSTRIES LIMITED Vs 1. Chhattisgarh State Power Transmission Company Limited 2. Chhattisgarh State Power Distribution Co Ltd 3. CHHATTISGARH STATE LOAD DESPATCH CENTRE |
अभ्यावेदन वर्ष 2024 - 25 के अंत में 31/03/2025 को अप्रयुक्त/ अतिरिक्त जमा उर्जा (बैंकिग एनर्जी) के संबंध में छत्तीसगढ़ विद्युत नियामक आयोग (ग्रीड इन्टरक्टिव वितरित नवीनीकरण उर्जा स्रोत) विनियम 2021 के कंडिका 21.7 में छुट तथा विद्युत अधिनियम 2003 की धारा 86(1)(F) के तहत छुट और DRE (Distributed Renewable Energy) Regulations 2019 की कंडिका 29 के अंतर्गत आदेश क्रमांक 35 ऑफ 2024 के अंतर्गत प्रस्तुत। Read More | See Proceeding | ||
| 45 | 45/2026 16-03-2026 |
Suo Motu Respondent 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Generation Company Limited |
Request for guidence in the matter of sale of un-requisitioned surplus power (URS). Read More | See Proceeding | ||
| 46 | 46/2026 17-03-2026 |
Chhattisgarh State Power Distribution Co Ltd | Seeking approval for procurement of additional Short-Term power during the FY 2025-26 above the Yearly Weighted Average Ceiling Price approved by the Honble Commission (CSERC). Read More | See Proceeding |
Disposed of order . 20-03-2026 |
|
| 47 | 47/2026 23-03-2026 |
Suo Motu Respondent 1. Chhattisgarh State Power Generation Company Limited |
Proposal for initiaiong suo-motu petition in respect of installation of FGD systems in CSPGCL plants for review f its installtations after issue of revised emission norms. Read More | See Proceeding | ||
| 48 | 48/2026 24-03-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. CHHATTISGARH STATE LOAD DESPATCH CENTRE |
Petition under Section 86 (1) (b) of the Electricity Act, 2003 for approval and adoption of Resource Adequacy Plan for Chhattisgarh (2024-25 to 2034-35) validated by the Central Electricity Authority, to meet out Chhattisgarh State Power Distribution Company’s (Petitioner) own peak and electrical energy requirement Read More | See Proceeding |
The case is disposed of. 05-08-2026 |
|
| 49 | 49/2026 30-03-2026 |
Ms Savitri Power Projects Private Limited Vs 1. Chhattisgarh State Power Distribution Co Ltd |
The present petition is filed for complying of the order dated 10/09/2025 (Annexure P/1) passed by this Hon’ble Commission in Petition No. 89 of 2023, wherein it was ordered that the respondent shall amend the existing PPA in terms of the Commission’s earlier order dated 09/02/2017. It was further directed that, the parties shall mutually decide the extension for financial closure within the period of two months. Read More | See Proceeding | ||
| 50 | 50/2026 08-04-2026 |
Suo Motu Respondent 1. DB Power Limited 2. BHARAT ALUMINIUM COMPANY LIMITED 3. Raigarh Energy Generation Limited 4. Chhattisgarh State Power Distribution Co Ltd |
Proposal for initiating Suo-Motu petition in reference to letter received from CSPDCL for issuing clarification in respect of Commissions order dated 01.12.2025 passed in petition no 81 of 2024(T) and 82 of 2024 (T) in respect of petition filed by M/s BALCO. Read More | See Proceeding | ||
| 51 | 51/2026 10-04-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. NTPC LTD |
Petition under Section 86 (1) (b) of the Electricity Act, 2003 for approval of supplementary power purchase agreement dated 18/11/2025 to the principal power purchase agreement dated 25/11/2010, executed by and between National Thermal Power Corporation Limited (NTPC) Chhattisgarh State Power Distribution Company Limited (CSPDCL), for procurement of power from thermal power plant from Lara Super Thermal Power Station, Stage-III (2x800 MW) Read More | See Proceeding |
Order passed on 03-07-2026 |
|
| 52 | 52/2026 16-04-2026 |
Khyati Ispat Private Limited Vs 1. Chhattisgarh State Power Transmission Company Limited 2. Chhattisgarh State Power Distribution Co Ltd |
Petition seeking exemption/relaxation from having dedicated feeder under clause 4.2.3 of Chhattisgarh State Electricity Grid Code 2011 for emabling grid connectivity and synchronization of co-located captive Solar Power Plant through existing 33 KV feeder without availing open access under section 86(1)(e) of the electricity Act 2003 Read More | See Proceeding |
Disposed off. 10-06-2026 |
|
| 53 | 53/2026 29-04-2026 |
Steel Works Innovations Private Limited Vs 1. Chhattisgarh State Power Distribution Co Ltd 2. Chhattisgarh State Power Transmission Company Limited |
Petition seeking exemption from having dedicated feeder for injection of power and also for drawl of power under clause 4.2.3 of CG Grid code for availing grid connectivity to co-located captive solar power plant through shared 33 KV feeder without availing open access under section 86 (1) (e) of the Electricity Act, 2003. Read More | See Proceeding |
Disposed. 10-06-2026 |
|
| 54 | 54/2026 07-05-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. Real Ispat and Energy Private Limited |
Petition under Section 86 (1) (k) of the Electricity Act, 2003 read with Clause 44 of the Conduct of Business Regulations, 2009, seeking clarification with respect to order dated 26.02.2026 passed in Petition No. 55 of 2025 Read More | See Proceeding |
Order passed 21-05-2026 |
|
| 55 | 55/2026 11-05-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. BHARAT ALUMINIUM COMPANY LIMITED |
Petition under Section 86 (1) (b) and 86 (1) (k) of the Electricity Act, 2003 seeking declaration with respect to Clause 4.4.2 and Clause 4.4.9 of the Power Purchase Agreement dated 19.01.2015 signed between the parties Read More | See Proceeding | ||
| 56 | 56/2026 11-05-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. ADANI POWER LIMITED |
Petition under Section 86 (1) (b) and 86 (1) (k) of the Electricity Act, 2003 seeking declaration with respect to Clause 4.4.2 and Clause 4.4.9 of the Power Purchase Agreement dated 08.07.2020 signed between the parties Read More | See Proceeding | ||
| 57 | 57/2026 11-05-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. ADANI POWER LIMITED |
Petition under Section 86 (1) (b) and 86 (1) (k) of the Electricity Act, 2003 seeking declaration with respect to Article 4.4.2 and Article 4.4.9 of the Power Purchase Agreement dated 09.02.2015 signed between the parties Read More | See Proceeding | ||
| 58 | 58/2026 12-05-2026 |
Suo Motu Respondent 1. Chhattisgarh State Power Distribution Co Ltd 2. Roopgarh Power and Alloys Pvt Ltd |
Clarification on order dated 03.03.2026 issued in petition no. 65 of 2025. Read More | See Proceeding |
The petition is dimissed. 20-05-2026 |
|
| 59 | 59/2026 14-05-2026 |
Suo Motu | Determination of generic tariff for FY 2026-27 under Regulation 7 of the Chhattisgarh State Electricity Regulatory Commission (terms and conditions for determination of tariff for Renewable Energy sources) Regulations, 2025. Read More | See Proceeding |
Order passed 03-07-2026 |
|
| 60 | 60/2026 15-05-2026 |
CHHATTISGARH BIO MASS ENERGY DEVELOPERS ASSOCIATION Vs 1. Chhattisgarh State Power Distribution Co Ltd |
Petition under Sections 86 (1) (b) (e) of the Electricity Act, 2003 in the matter of seeking extension of the tenure of standard Power Purchase Agreement of Biomass Power Plants with Respondent CSPDCL, upto useful life or upto such extended tenure as decided by the Hon’ble Commission Read More | See Proceeding |
Order Passed. 28-07-2026 |
|
| 61 | 61/2026 21-05-2026 |
Suo Motu Respondent 1. Chhattisgarh State Power Distribution Co Ltd |
विद्युत उपभोक्ता षिकायत निवारण फोरम के सदस्यो की नियुक्ति एवं आयोग द्वारा स्वप्रेरित याचिका क्र. 61/2025 में पारित आदेष दिनांक 17.02.2026 का छ0ग0 स्टेट पॉवर डिस्ट्रीब्युषन कंपनी लिमिटेड द्वारा परिपालन संबंधी प्रतिवेदन अप्राप्त है। Read More | See Proceeding | ||
| 62 | 62/2026 22-05-2026 |
Ms Vighneshwar Ispat Pvt Ltd Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
SEEKING EXEMPTION FROM HAVING DEDICATED FEEDER FOR AVAILING OPEN ACCESS TO DRAW POWER AT USER END UNDER PROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 86(1)(e) OF ELECTRICITY ACT 2003 Read More | See Proceeding | ||
| 63 | 63/2026 29-05-2026 |
RAG Ferro Alloys Pvt Ltd Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
APPLICATION SEEKING PERMISSION FOR AVAILING OPEN ACCESS TO DRAW POWER AT USER END AND EXEMPTION FROM HAVING DEDICATED FEEDER UNDER PROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 42(3) OF ELECTRICITY ACT 2003 Read More | See Proceeding | ||
| 64 | 64/2026 29-05-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. ACB INDIA LTD TPP Village Renki PO Chainpur Teh Pali Dist Korab CG |
Petition under Section 86 (1) (b) and 86 (1) (k) of the Electricity Act, 2003 seeking declaration with respect to Clause 4.4.2 and Clause 4.4.9 of the Power Purchase Agreement dated 22.01.2016 signed between the parties Read More | See Proceeding | ||
| 65 | 65/2026 29-05-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. Maruti Clean Coal and Power Limited |
Petition under Section 86 (1) (b) and 86 (1) (k) of the Electricity Act, 2003 seeking declaration with respect to Clause 4.4.2 and Clause 4.4.9 of the Power Purchase Agreement dated 09.12.2013 signed between the parties Read More | See Proceeding | ||
| 66 | 66/2026 29-05-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. TRN Energy Private Limited |
Petition under Section 86 (1) (b) and 86 (1) (k) of the Electricity Act, 2003 seeking declaration with respect to Clause 4.4.2 and Clause 4.4.9 of the Power Purchase Agreement dated 26.05.2015 signed between the parties Read More | See Proceeding | ||
| 67 | 67/2026 29-05-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. ACB India Limited |
Petition under Section 86 (1) (b) and 86 (1) (k) of the Electricity Act, 2003 seeking declaration with respect to Clause 4.4.2 and Clause 4.4.9 of the Power Purchase Agreement dated 05.12.2013 and 10.09.2018 signed between the parties Read More | See Proceeding | ||
| 68 | 68/2026 29-05-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. ACB India Limited |
Petition under Section 86 (1) (b) and 86 (1) (k) of the Electricity Act, 2003 seeking declaration with respect to Clause 4.4.2 and Clause 4.4.9 of the Power Purchase Agreement dated 05.12.2013 signed between the parties Read More | See Proceeding | ||
| 69 | 69/2026 29-05-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. ACB India Limited |
Petition under Section 86 (1) (b) and 86 (1) (k) of the Electricity Act, 2003 seeking declaration with respect to Clause 4.4.2 and Clause 4.4.9 of the Power Purchase Agreement dated 15.01.2015 signed between the parties Read More | See Proceeding | ||
| 70 | 70/2026 29-05-2026 |
Hitech Power and Steel Ltd Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
APPLICATION SEEKING PERMISSION FOR AVAILING OPEN ACCESS TO DRAW POWER UNDER THE ROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 42(3) OF ELECTRICITY ACT 2003 Read More | See Proceeding |
Disposed. 11-06-2026 |
|
| 71 | 71/2026 29-05-2026 |
Nandan Steels and Power Ltd Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
APPLICATION SEEKING EXEMPTION FROM HAVING DEDICATED FEEDER AND PERMISSION FOR AVAILING OPEN ACCESS TO DRAW / PURCHASE POWER FROM INTER-STATE / INTRA-STATE UNDER THE PROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 86(1)(e) OF ELECTRICITY ACT 2003 Read More | See Proceeding | ||
| 72 | 72/2026 12-06-2026 |
Suo Motu Respondent 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd 4. JINDAL STEEL AND POWER LIMITED 5. Jindal Power Limited |
Suo Motu petition for Multi Supply Consumers (MSCs) who have not scheduled power in some time blocks. Read More | See Proceeding | ||
| 73 | 73/2026 12-06-2026 |
Suo Motu Respondent 1. Chhattisgarh State Power Transmission Company Limited 2. Chhattisgarh State Power Distribution Co Ltd 3. Ultratech Cement Ltd Unit Baikunth Cement Works 4. CHHATTISGARH STATE LOAD DESPATCH CENTRE 5. Nu Vista Limited |
Suo motu petition fo rMulti Supply Consumers(MSCs) who have very-short duration/ intermittent Open access. Read More | See Proceeding | ||
| 74 | 74/2026 17-06-2026 |
Ms Indian Ispat Works Pvt Ltd Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
APPLICATION SEEKING EXEMPTION FROM HAVING DEDICATED FEEDER FOR AVAILING OPEN ACCESS TO DRAW POWER AT USER END UNDER PROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 86(1)(e) OF ELECTRICITY ACT 2003 Read More | See Proceeding | ||
| 75 | 75/2026 17-06-2026 |
Ms MR Enterprises Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
APPLICATION SEEKING EXEMPTION FROM HAVING DEDICATED FEEDER FOR AVAILING OPEN ACCESS TO DRAW POWER AT USER END AND UNDER PROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 86(1)(e) OF ELECTRICITY ACT 2003 Read More | See Proceeding | ||
| 76 | 76/2026 17-06-2026 |
Ms Sarwottam Strips Pvt Ltd Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
APPLICATION SEEKING EXEMPTION FROM HAVING DEDICATED FEEDER FOR AVAILING OPEN ACCESS TO DRAW POWER AT USER END UNDER PROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 86(1)(e) OF ELECTRICITY ACT 2003 Read More | See Proceeding | ||
| 77 | 77/2026 17-06-2026 |
Ms Vishv Guru Ispat Pvt Ltd Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
APPLICATION SEEKING PERMISSION FOR AVAILING OPEN ACCESS TO DRAW POWER AT USER END UNDER PROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 86(1)(e) OF ELECTRICITY ACT 2003 Read More | See Proceeding |
Withdraw the petition. 30-07-2026 |
|
| 78 | 78/2026 17-06-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. DB Power Limited |
Petition under Section 86 (1) (b) and 86 (1) (k) of the Electricity Act, 2003 seeking declaration with respect to Clause 4.2.1, 4.3.2, 4.4.4 and Clause 4.4.2 of the Power Purchase Agreement dated 05.01.2011 signed between the parties Read More | See Proceeding | ||
| 79 | 79/2026 17-06-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. Jindal Power Limited |
The instant petition is being filed seeking declaration with respect to Clause 4.4.2 and Clause 4.4.9 of the Power Purchase Agreement dated 06.12.2013 signed between the Petitioner and Respondent which bounds the Respondent to ensure supply of 5% of the net generated power to Petitioner maintaining constant firm supply as per the terms of the agreement. Read More | See Proceeding | ||
| 80 | 80/2026 17-06-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. Malka Renewable Energy Pvt Ltd |
Petition under Section 62 read with Section 86(1)(b) of the Electricity Act, 2003 for approval of deviations in the Power Purchase Agreement dated 25.03.2022 executed between CSPDCL and M/s Malka Renewable Energy Pvt. Ltd. and approval of procurement of 8 MW Small Hydro Power. Read More | See Proceeding | ||
| 81 | 81/2026 19-06-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. Shreyas Energy One Private Limited |
Petition under Section 63 read with Section 86(1)(b) of the Electricity Act, 2003 seeking adoption of tariff discovered through competitive bidding for procurement of 125 MW / 500 MWh Battery Energy Storage System 40BESS41 capacity under VGF scheme. Read More | See Proceeding | ||
| 82 | 82/2026 19-06-2026 |
Daneshwar Sahu Vs 1. Chhattisgarh State Power Distribution Co Ltd |
Application for penal and prosecution proceedings under Sections 142 and 146 of the Electricity Act, 2003, regarding the non-compliance with the Order dated 17/03/2026 issued by the Electricity Ombudsman, Raipur. Read More | See Proceeding | ||
| 83 | 83/2026 08-07-2026 |
Nav Durga Ispat Pvt Ltd Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
APPLICATION SEEKING EXEMPTION FROM HAVING DEDICATED FEEDER AND PERMISSION FOR AVAILING OPEN ACCESS TO DRAW / PURCHASE POWER FROM INTER-STATE / INTRA-STATE UNDER THE PROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 86(1)(e) OF ELECTRICITY ACT 2003 Read More | See Proceeding | ||
| 84 | 84/2026 08-07-2026 |
Ms Maurvi Ispat Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
APPLICATION SEEKING EXEMPTION FROM HAVING DEDICATED FEEDER FOR AVAILING OPEN ACCESS TO DRAW POWER AT USER END UNDER PROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 86(1)(e) OF ELECTRICITY ACT 2003 Read More | See Proceeding | ||
| 85 | 85/2026 08-07-2026 |
Suo Motu Respondent 1. Municipal Corporation Durg 2. Municipal Corporation Risali 3. Municipal Corporation Bhilai 4. Chhattisgarh State Power Distribution Company Limited |
दुर्ग भिलाई क्षेत्र में प्रतिदिन सुबह 1 घंटे की विद्युत कटौती से संबंधित दैनिक समाचार पत्र के संबंध में। Read More | See Proceeding | ||
| 86 | 86/2026 09-07-2026 |
Saroj Wadde Rice Mill Vs 1. Chhattisgarh State Power Distribution Co Ltd |
अभ्यावेदन विद्युत अधिनियम 2003 की धारा (142) एवं धारा (146) के अंतर्गत बनाए गए नियमों एवं विनियमों का उल्लघंन-माननीय विद्युत लोकपाल के पारित आदेश प्रकरण क्रमांक 21/2024 दिनांक 07/08/2024 का अनुपालन न किये जाने बावत्। Read More | See Proceeding | ||
| 87 | 87/2026 09-07-2026 |
Dayal Industries Pvt Ltd Vs 1. Chhattisgarh State Power Distribution Co Ltd |
अभ्यावेदन विद्युत अधिनियम 2003 की धारा (142) एवं धारा (146) के अंतर्गत बनाए गए नियमों एवं विनियमों का उल्लघंन-माननीय विद्युत लोकपाल के पारित आदेश प्रकरण क्रमांक 11/2025 दिनांक 03/12/2025 का अनुपालन न किये जाने बावत्। Read More | See Proceeding | ||
| 88 | 88/2026 09-07-2026 |
Chhattisgarh State Power Distribution Co Ltd Vs 1. Solar Energy Corporation of India Limited |
Petition under Section 63 read with Section 86(1)(b) of the Electricity Act, 2003 for approval of the Power Sale Agreement dated 12.05.2026 executed between Chhattisgarh State Power Distribution Company Ltd. and Solar Energy Corporation of India Ltd. for procurement of 300 MW assured peak renewable power. Read More | See Proceeding | ||
| 89 | 89/2026 16-07-2026 |
The Tata Power Company Limited | Petition under Section 14 and Section 15 of Electricity Act, 2003 read with Chhattisgarh State Electricity Regulatory Commission (Licence) Regulations, 2004 read with Distribution of Electricity Licence (Additional Requirements of Capital Adequacy, Creditworthiness and Code of Conduct) Rules, 2005, as amended in November 2022, for grant of Distribution Licence for the geographically connected area comprising of Raipur, Dharsiwa, Mandir Hasoud and Abhanpur Tehsils of Raipur district as per provisions under Electricity Act, 2003 Read More | See Proceeding | ||
| 90 | 90/2026 20-07-2026 |
ARVIND INDUSTRIES | non compliance of consumer forum Bilaspur order dated 20-02-2024 Read More | See Proceeding | ||
| 91 | 91/2026 03-08-2026 |
CEMENT CORPORATION OF INDIA LIMITED Vs 1. Chhattisgarh State Power Distribution Co Ltd |
PETITION U/S 86(1)(f) READ WITH SECTION 86(1)(k) AND SECTION 181 OF THE ELECTRICITY ACT 2003, AND THE CSERC (CONDUCT OF BUSINESS) REGULATIONS FOR RECONCILIATION AND DETERMINATION OF THE ACTUAL PRINCIPAL ELECTRICITY DUES PAYABLE BY THE PETITIONER IN RESPECT OF ITS AKALTARA UNIT, AND FOR CONNECTED AND INTERIM RELIEFS Read More | See Proceeding | ||
| 92 | 92/2026 07-08-2026 |
Chhattisgarh Steel Rerollers Association Vs 1. Chhattisgarh State Power Distribution Co Ltd |
Petition for clarification and/or removal of difficulty on Tariff Order FY2026-27 dated 15.6.2026 passed in Petition No.103/2025(T), with respect to retail tariff schedule of low load-factor industries under HV4- Steel Industries Category Read More | See Proceeding | ||
| 93 | 93/2026 07-08-2026 |
SKA Steel and Power Pvt Ltd Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
APPLICATION SEEKING EXEMPTION FROM HAVING DEDICATED FEEDER FOR AVAILING OPEN ACCESS TO DRAW POWER AT USER END UNDER PROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 86(1)(e) OF ELECTRICITY ACT 2003 Read More | See Proceeding | ||
| 94 | 94/2026 07-08-2026 |
SKA Ispat Pvt Ltd Vs 1. Chhattisgarh State Power Transmission Company Limited 2. CHHATTISGARH STATE LOAD DESPATCH CENTRE 3. Chhattisgarh State Power Distribution Co Ltd |
APPLICATION SEEKING PERMISSION FOR AVAILING OPEN ACCESS TO DRAW POWER UNDER THE ROVISIONS OF CLAUSE 5(5) OF CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) REGULATIONS 2011 AS AMENDED BY CSERC (CONNECTIVITY AND INTRA-STATE OPEN ACCESS) (FIRST AMENDMENT) REGULATIONS 2012 AND SECTION 86(1)(e) OF ELECTRICITY ACT 2003 Read More | See Proceeding | ||
| 95 | 95/2026 07-08-2026 |
Maa Durga Minerals Vs 1. Chhattisgarh State Power Distribution Co Ltd |
Petition in the matter of non-compliance of provisions of Tariff Order FY25-26 with respect to tariff classification of consumer (Petitioner) availing electricity supply for Stand-alone Stone Crusher, under Section 142 read with Section 45 and 62 of the Electricity Act 2003 Read More | See Proceeding | ||
| 96 | 96/2026 10-08-2026 |
APR UDYOG PRIVATE LIMITED Vs 1. Chhattisgarh State Power Distribution Co Ltd |
Petition under Sections 86 (1) (e) (f) of the Electricity Act, 2003 in the matter of imposition of excess demand and energy charges levied due to drawl of demand in excess of contract demand. Read More | See Proceeding | ||
| 97 | 97/2026 10-08-2026 |
Abis Foods and Proteins Pvt Ltd Amlidih Vs 1. Chhattisgarh State Power Distribution Co Ltd |
Petition/ Complaint in the matter of Non-Compliance/ Partial Compliance of the order of Honble Commission dated 14.9.2023 in Petition No.35 of 2023 by the Respondent CSPDCL Read More | See Proceeding |